Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Jul 12 - Jul 17
For Your Every Summer RSVP, with Code: SUMMER15
Description
Cortec Boiler Lizard - Rust Inhibitor for Dry Layup of BoilersKey Features: Anti rust powder in a PVA water soluble bag. NSF G7 certification (Reg. #170844) Each bags protects up to 1000 gallon system capacity. Prevents rust on ferrous metals and aluminum. No need for removal of product or bag. Cortec's Boiler Lizard contains Vapor phase Corrosion Inhibitor powder in a polyvinyl alcohol (PVA) water soluble bag. The powder formulation is free of phosphates, heavy metals, nitrites and free amines. Designed for dry
Key Features:
- Anti rust powder in a PVA water soluble-bag.
- NSF G7 certification (Reg. #170844)
- Each bags protects up to 1000 gallon system capacity.
- Prevents rust on ferrous metals and aluminum.
- No need for removal of product or bag.
Cortec®'s Boiler Lizard® contains Vapor phase Corrosion Inhibitor powder in a polyvinyl alcohol (PVA) water-soluble bag. The powder formulation is free of phosphates, heavy metals, nitrites and free amines. Designed for dry layup of boilers, it protects metals in enclosed spaces. The VCIs vaporize and adsorb on the metal surfaces, reaching all recessed areas and interior cavities. Boiler Lizard® has NSF G7 certification (Reg. #170844) and can be used in and around food processing areas if the treated water or steam has no food contact.
Packaging:
Boiler Lizards are supplied in carton tubes (1 bag per tube). Tube is 3"D x 37"H. Bag is 4"W x 34"H.
How to Use:
Completely drain and cool boiler down. Remove from outer packaging. Place Boiler Lizard® flat in boiler and slit open the inner water-soluble bag to begin total corrosion protection. Slit 2" from one end to 2" from the other end. Seal all openings to the boiler internals. No product or inner bag removal needed prior to boiler start-up. When the boiler is put back in service, fill with water and follow normal startup procedure. The inner PVA bag will dissolve. Do not user on copper, copper-based alloys and other soft yellow metals. Compatibility with non-metallics should be evaluated. Caking of powder may occur when it is exposed to moisture and then dried.
Typical Applications:
Use Boiler Lizard® for dry layup of mid-size boilers. Provides continuous rust prevention during dry layup period of up to 12 months. It can be used together with Boiler Egg™ to scavenge dissolved oxygen and passivate metal Eliminates the need for other forms of protection including nitrogen blankets, quicklime or silica gel desiccants, and dry air circulation.
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy