Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Jul 10 - Jul 15
For Your Every Summer RSVP, with Code: SUMMER15
Description
Community Collection and Recycling of HDPE and PP in Buenos Aires, Argentina (PPRS)In Argentina, the vast majority of post consumer plastic remains outside the formal recycling system, ending up in open dumps, landfills, or dispersed across urban and peri urban environments. Limited recycling infrastructure and a lack of economic incentives hinder material recovery. This project reduces plastic leakage by financing traceable collection and recycling, preventing long term environmental accumulation. Post consumer plastic wastes, such
In Argentina, the vast majority of post-consumer plastic remains outside the formal recycling system, ending up in open dumps, landfills, or dispersed across urban and peri-urban environments. Limited recycling infrastructure and a lack of economic incentives hinder material recovery. This project reduces plastic leakage by financing traceable collection and recycling, preventing long-term environmental accumulation.
Post-consumer plastic wastes, such as films, plastic bags, flexible packaging, and rigid containers, are collected by waste pickers or through community collection points. The plastic wastes collected are then cleaned and sorted by plastic type, specifically HDPE and PP, in preparation for transport by independent operators to the recycling facility located in Ensenada, Buenos Aires, Argentina.
Upon arrival of clean and sorted plastic wastes, the facility further sorts the plastic wastes, which is then washed to remove contaminants. The material is then shredded, melted, extruded, and pelletized to produce recycled HDPE and PP pellets that are reintroduced into industrial supply chains, supporting a circular plastic production. The recycled pellets can be used again in manufacturing plastic packaging, bags, and films, and can also be blended with virgin plastic to create new products.
The facility is owned and operated by the project partner which allows full traceability from the collection of the waste material to the final recycled pellets. The recovered and processed volumes are verified under a plastic standard through traceability systems and third-party audits.
Revenue from plastic credit sales enables the recovery of materials that, due to economic barriers, would otherwise remain outside the formal recycling system. These revenues are directly reinvested to strengthen recovery and recycling infrastructure. Specifically, they support:
Post-consumer plastic wastes, such as films, plastic bags, flexible packaging, and rigid containers, are collected by waste pickers or through community collection points. The plastic wastes collected are then cleaned and sorted by plastic type, specifically HDPE and PP, in preparation for transport by independent operators to the recycling facility located in Ensenada, Buenos Aires, Argentina.
Upon arrival of clean and sorted plastic wastes, the facility further sorts the plastic wastes, which is then washed to remove contaminants. The material is then shredded, melted, extruded, and pelletized to produce recycled HDPE and PP pellets that are reintroduced into industrial supply chains, supporting a circular plastic production. The recycled pellets can be used again in manufacturing plastic packaging, bags, and films, and can also be blended with virgin plastic to create new products.
The facility is owned and operated by the project partner which allows full traceability from the collection of the waste material to the final recycled pellets. The recovered and processed volumes are verified under a plastic standard through traceability systems and third-party audits.
Revenue from plastic credit sales enables the recovery of materials that, due to economic barriers, would otherwise remain outside the formal recycling system. These revenues are directly reinvested to strengthen recovery and recycling infrastructure. Specifically, they support:
- Strengthening the recovery network by improving working conditions for waste pickers and recyclers
- Increasing the volume of plastic collected that would otherwise remain outside the recycling system
- Expanding and improving the operational capacity of the recycling facility
- Enhancing traceability and monitoring systems for recovered materials
- Reducing the economic gap between recycled and virgin plastic, enabling the recovery and recycling of materials that would otherwise be discarded The project’s objective is to scale circular infrastructure and expand the real capacity for plastic recovery.
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy
4.6 ★★★★★
Based on 1662 reviews
Sort
Product Reviews
★★★★★ 1
Before use on March 15 two days later March 17 engine light still on
Size: 1 Count (Pack of 1), Size: 1 Count (Pack of 1)
I read the specs on this product and it was guaranteed to cleanse as well as turn engine light off in vehicle. I received it March 14.2026 and used it on March 15.2026 I took a picture on Sunday before I entered it into the gas tank engine light was on at that time. Today is March 17.2026 and engine light is still on. The truck was driven for one hour on the 15th 45 minutes on the 16th and 50 minutes on 17 March. Still the engine light is on. Got home parked the vehicle took a picture again to show engine light is still on product guaranteed it was shut it off, but unfortunately product does not work.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on March 17, 2026
★★★★★ 4
Good stuff
Size: 1 Count (Pack of 1)
I've used and it's worked for emissions for me and that's with having check engine light on..use stuff,drive around a bit,clear code drive to emissions and should b good unless got serious problems. It's good to use 1 or 2 times a yr if high mileage vehicle.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on January 1, 2025
★★★★★ 5
It works!
Size: 1 Count (Pack of 1)
My 2005 Jetta failed the inspection and my mechanic said (after clearing the engine light) that I should drive the car for 20 min highway and 20 local. We've tried that the whole day but out of three lights on his device only 1 went away. Next day the light engine came back. After not being happy with the explanation offered by him (a family friend) that I should keep driving it until we get lucky I went online and found CRC 05063. Followed the instruction (one bottle on full tank of gas). Before my tank was under 3/4, engine light went off!! At half tank I went and did the inspection - IT PASSED! I am really impressed!
Update August 2015!
I have been using this product for 2-3 years now and if it is not working for you please read. In July I have used the first bottle and took my 2005 Jetta for inspection. It failed. Ordered a second bottle and it failed again. My mechanic said keep driving. Did 200 miles in one day and nothing. Decided to take matters in my own hands and ordered Autel MaxiScan MS300 ($18, it allows you to read and delete codes). There were two faults - EVAP and 2nd something about Oxygen. Went online and this is the first time I heard about driving cycles. These are steps that you have to follow so that your car's computer can start measuring all the parameters needed for the test. Driving cycles are not exact science but I tried to follow the instructions as much as I could and after just 20 minutes (10min city and 10min highway) ALL the parameters were set and I passed the emission test with flying colors! So, just before you give a comment about CRC like "tried and didn't work" be aware that there are other things you have to take into account.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on July 1, 2013
★★★★★ 3
My car did not pass!
Size: 1 Count (Pack of 1)
My car didn't pass. However, the company CRC sent me a reimbursement check.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on May 21, 2026
★★★★★ 5
Pass Again
Size: 1 Count (Pack of 1)
This product never fails (no pun intended), I have been using this for the last 10 years my car has never failed a smog test. I highly recommend this and that you use it correctly. You will not be disappointed.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on March 27, 2026
recommand products
Advance Tabco OT20-3 Mobile Full-Height Oval Tray Rack Cart, Open Sides, 20-Tray Capacity
531.50
DP21036 - Zestaw klocków hamulcowych seria GREENSTUFF EBC Brakes BMW | 5 Series (E39)(530) | 5 Series (E39)(535) | 5 Series (E39
110.91
Anets 40AV Valve-Controlled Tube Fired Gas Fryer, 35-40 lb Oil Capacity, Floor Model
3361.49
DP21076 - Zestaw klocków hamulcowych seria GREENSTUFF EBC Brakes MITSUBISHI | Carisma | Colt | Spacestar | PROTON | Impian | PRO
87.50
Billabong Mens Momentum Pro Performance 19" Boardshorts
23.96